Tempat asal
Tianjin, China
Paduan atau tidak
Tanpa Aloi
Kelas
Q195/Q235/Q345/ST52/ST37/A53(A,B)
Waktu pengiriman
22-30 Hari
Aplikasi
Pipa Cairan, Selang Boiler, Pipa Bor, Pipa Hidrolik, Pipa Gas, Pipa Minyak, Selang Pupuk Kimia, Pipa Struktur, Lainnya, low pressure liquid delivery/construction structure pipe
Pipa khusus
low pressure liquid delivery/construction structure pipe
Panjang
12M, 6 M, As your request, 5.8m
Pengolahan Layanan
Welding, Meninju, Cutting, Bending
Standard
BS/JIS/DIN/EN/ASTM A53-2007/GB/T
Material
Q195/Q235/Q345/ST52/ST37/A53(A,B)
Secondary Or Not
Non-secondary
Surface
Bared/ Black Painted / Galvanized/With Oiled
End protector
Plastic pipe cap/ Iron protector/as request
Usage
low pressure liquid delivery/construction structure pipe
Date of Delivery
7-30 days after receiving your deposit