After finishing the production, we will clean and packed it before it is qualified by the QC manager. First we will put drying desiccant inside the machine (protect the machine from wet damage during the transportation), then put 6mm cystosepiment outside it and upgrade the thermal contracting film. Finally we will put wooden case and steel belt. We will upgrade again according to different machine to protect the damage of the machine before loading the container.