Casting + Mesin (jika Perlu) + Permukaan Pengobatan
Layanan
Disesuaikan OEM
Standar
DIN
Proses pengerjaan
Kehilangan Lilin + CNC Permesinan
Sertifikasi
ISO9001:2008
Pengemasan dan pengiriman
Rincian Kemasan
Every 500----1,500 bolts are placed in a plastic bag and sealed. Every 4/8/12/16 plastic bags are placed in a carton. Every 8/16/32 trays are placed on a wooden pallet. Every 16 wooden pallets placed in one container